Sichuan Sublimation Project

Customer pain points

There are many goods with different sizes, which makes sorting difficult and labor costs high

The production line has high safety protection and needs to have a complete fire protection system

High precision requirements, in line with the production rhythm of the production line

Implementation plan

Warehouse information: 4450㎡, net height 12m

Total number of cargo spaces: about 9175

Number of equipment: 8 four-way vehicles, 6 elevators

Project value

Construction of a pallet four-way shuttle warehouse, inventory increased by 210%

Intelligent remote management reduces labor costs and greatly improves safety

Relying on smart warehouses, the efficiency of warehousing and warehousing increased by 120%, and the accuracy rate reached 99.99%