Sichuan Leshan Project

Customer pain points

Affected by land and labor costs, warehouse operating costs and labor costs have increased

Special industry requirements: copper, zinc, nickel and other materials are prohibited

The trend of intelligence is obvious, and the construction of a platform-level logistics system needs to be realized

Implementation plan

Warehouse information: 1260㎡, net height 4.2m

Total number of cargo spaces: about 712

Number of equipment: 3 four-way vehicles, 2 elevators

Project value

The safety protection and precision requirements of the production line are greatly improved

Combined with the warehousing software system independently developed by Niuyan Intelligence, the product entry and exit are tracked in real time with an accuracy rate of 99.99%

Relying on smart warehouses, unmanned remote management is realized, and labor costs are reduced

Sichuan Leshan Project