Siemens High Voltage Project

Customer pain points

Affected by the transformation and upgrading of the power grid, the storage cycle of the power company warehouse has become shorter and the turnover rate has accelerated

The peak and trough of the operation volume vary greatly, requiring rapid entry and exit

The timeliness requirement for emergency exit is high, and there are emergency repair and rescue operations. The warehouse needs to locate materials in a short time

The volume, weight and other parameters of the materials vary greatly, and there are various storage methods such as material boxes, pallets, ground piles, and container bags

Implementation plan

Warehouse information: Net height 11m

Total number of cargo spaces: about 5673

Number of equipment: 8 four-way vehicles, 2 hoists

Project value

Remote monitoring and operation and maintenance system to meet the unmanned management of 90% of power materials

Digital twin platform realizes digital management and operation of warehouses

Flexible and intelligent technology increases the volume ratio by 350% and the efficiency of warehousing and warehousing by 160%

Siemens High Voltage Project